1. Can Unpermitted Construction Receive Approval before a Sale?
Previously completed construction may qualify for approval, but its age does not establish compliance. The city must determine whether permits were required and whether the work meets applicable standards.
Determine Whether a Permit Was Required
Torrance Municipal Code § 81.2.2 identifies work exempt from building permits under the city's amendments to the California Building Code. Structural additions, garage conversions, and significant electrical or plumbing alterations may require permits.
Buyers should compare the property's layout with approved plans. A missing online record alone does not establish a violation.
Check Whether the Work Can Be Approved
Completed improvements may require plans, engineering documentation, inspections, or physical corrections.
A patio converted into living space may raise structural, ventilation, and fire safety concerns. Even after repairs, its intended use must comply with applicable zoning requirements.
2. How Does Torrance Review Previously Completed Construction?

Torrance evaluates construction through zoning review, building permit applications, and inspections. Each process addresses a separate compliance requirement.
Complete Zoning Screening and Permit Review
Since January 5, 2026, Torrance has required electronic building permit submissions through its Citizen Access Portal.
Projects subject to Zoning Screening generally require approval before the building permit application proceeds. Zoning clearance does not replace building approval.
Address Outstanding Inspections
The Building and Safety Division may require access to concealed construction, additional documentation, or corrective work. Applicants must resolve identified deficiencies and obtain required inspection approvals.
| Permit Status | Required Review |
|---|---|
| No permit located | Determine whether a permit was required |
| Permit not finalized | Identify outstanding inspections |
| Work differs from approved plans | Review revisions or corrections |
| Inspection failed | Complete corrections and reinspection |
| Zoning conflict | Evaluate available modifications or approvals |
No permit located
- Required ReviewDetermine whether a permit was required
Permit not finalized
- Required ReviewIdentify outstanding inspections
Work differs from approved plans
- Required ReviewReview revisions or corrections
Inspection failed
- Required ReviewComplete corrections and reinspection
Zoning conflict
- Required ReviewEvaluate available modifications or approvals
Buyers should obtain written confirmation of unresolved requirements before relying on estimated correction costs.
3. Who Pays for Unpermitted Construction Corrections?
The purchase agreement allocates contractual responsibility for unresolved work, subject to applicable law. Seller disclosures may also affect the buyer's legal options.
Review Seller Disclosure Obligations
California Civil Code §§ 1102 and 1102.6 govern disclosures for covered residential transfers. The Transfer Disclosure Statement addresses the seller's awareness of additions or alterations made without necessary permits.
Civil Code § 1102.6h imposes additional disclosure requirements on certain single-family homes resold within 18 months of acquisition.
Buyers should compare these disclosures with permit records because disclosure alone does not establish compliance.
Assign Costs before Closing
Buyers may negotiate seller-funded corrections, a price adjustment, or a closing extension.
A written agreement should identify the required work, responsible party, payment obligations, completion deadline, and consequences if approval cannot be obtained.
Where construction remains unfinished, any escrow holdback must have clear release conditions and comply with applicable transaction requirements.
4. What If the City Rejects the Existing Construction?
A denial may require repairs, revised plans, changes to the intended use, or removal of unauthorized work. The reason for rejection determines the available response.
Distinguish Building Defects from Zoning Violations
An electrical defect may be corrected through repairs and reinspection. A zoning restriction on residential use requires a separate analysis.
For example, repairing a garage conversion does not necessarily authorize its use as a separate rental dwelling.
Buyers should obtain the city's written findings before agreeing to assume correction obligations.
Assess Risks after Closing
Ownership transfers do not eliminate outstanding code compliance obligations. A purchaser may face future correction costs or restrictions on use.
If a seller concealed or materially misrepresented known unpermitted work, potential real estate dispute resolution options depend on the disclosures, contract terms, evidence, and applicable California law.
Defective workmanship causing property damage may also raise a separate construction defect litigation issue.
5. Legal Review before Purchasing Unpermitted Construction
Unresolved permits should be addressed before the buyer accepts contractual responsibility for corrections.
SJKP LLP's attorneys can review municipal records, seller disclosures, and purchase agreements to identify outstanding obligations. Where a dispute arises from undisclosed construction or correction costs, a residential real estate lawsuit may be appropriate if the evidence supports a claim.
19 Nov, 2026

